We build
AI factories.

From power to compute.
From ambition to intelligence.

Live power. Purpose-built systems. Our engineers.
Your dedicated GPU cluster, built and operated by Vertical.

Explore the infrastructure
Concept visualization of a vast AI data centre with rows of black GPU racks, overhead cooling pipes, and orange industrial detailing
Industrial scale.
Intelligent by design.

Partners

The infrastructure
behind intelligence.

Four layers.
One operator.

We design, build, and operate the infrastructure powering the next generation of artificial intelligence.

  1. AI workloads

    Your models. Your ambitions. Dedicated compute for training and inference.

  2. Dedicated GPU clusters

    NVIDIA systems, connected and configured as one cluster. Built for your workloads, operated by our engineers.

  3. Data centre infrastructure

    The physical foundation: buildings, cooling, and connectivity brought together around the demands of AI.

  4. Power, ready to work.

    We start with live power and existing buildings. The foundation for everything above.

1 GW by 2027.

Because intelligence
needs it.

15 MW is live today. By the end of 2027, a gigawatt, built 10 MW at a time.

  1. Now15 MWLive today on NVIDIA H100 and B300.
  2. 2027100 MWThe next generation: NVIDIA Vera Rubin.
  3. End of 20271 GWThe mission. A gigawatt of AI infrastructure.

The hardware behind
your next breakthrough.

From Hopper to Blackwell Ultra. NVIDIA compute at the heart of dedicated clusters, built and operated by Vertical.

72 connected Blackwell Ultra GPUs. One liquid-cooled system for the most demanding AI workloads.

Explore GB300

Notes from the build.

Ideas and lessons from building the infrastructure behind intelligence.

View all posts
  1. Why we start with live power

    The scarcest part of an AI factory isn’t the GPUs. It’s the megawatts behind them. So we begin where the power is already on.

Architectural reference: an aerial view of a data centre under construction in Dublin, with exposed steel framing and rooftop cooling equipment

Build the physical
future of AI.

We’re bringing power, data centres, and compute together. Join the people building the infrastructure behind intelligence.

Join Vertical