
We build
AI factories.
From power to compute.
From ambition to intelligence.
Live power. Purpose-built systems. Our engineers.
Your dedicated GPU cluster, built and operated by Vertical.

Intelligent by design.
Partners
The infrastructure
behind intelligence.
Four layers.
One operator.
We design, build, and operate the infrastructure powering the next generation of artificial intelligence.
AI workloads
Your models. Your ambitions. Dedicated compute for training and inference.
Dedicated GPU clusters
NVIDIA systems, connected and configured as one cluster. Built for your workloads, operated by our engineers.
Data centre infrastructure
The physical foundation: buildings, cooling, and connectivity brought together around the demands of AI.
Power, ready to work.
We start with live power and existing buildings. The foundation for everything above.
1 GW by 2027.
Because intelligence
needs it.
15 MW is live today. By the end of 2027, a gigawatt, built 10 MW at a time.
- Now15 MWLive today on NVIDIA H100 and B300.
- 2027100 MWThe next generation: NVIDIA Vera Rubin.
- End of 20271 GWThe mission. A gigawatt of AI infrastructure.
The hardware behind
your next breakthrough.
From Hopper to Blackwell Ultra. NVIDIA compute at the heart of dedicated clusters, built and operated by Vertical.
72 connected Blackwell Ultra GPUs. One liquid-cooled system for the most demanding AI workloads.
Explore GB300Blackwell Ultra compute in an eight-GPU system, built for large-model training and reasoning.
Explore B300The Hopper foundation for AI training, inference, and high-performance computing.
Explore H100Hopper with expanded HBM3e memory to accelerate memory-intensive AI and scientific workloads.
Explore H200Notes from the build.
Ideas and lessons from building the infrastructure behind intelligence.
Why we start with live power
The scarcest part of an AI factory isn’t the GPUs. It’s the megawatts behind them. So we begin where the power is already on.
Designing a hall for racks that draw over 100 kW
Rack-scale GPU systems changed the unit of design. A data hall is now planned around liquid, weight and power per rack, not floor area.
What “dedicated” means in a dedicated GPU cluster
No shared tenancy, no noisy neighbors, no surprises in the scheduler. A cluster that’s yours, run by people who know it.

Build the physical
future of AI.
We’re bringing power, data centres, and compute together. Join the people building the infrastructure behind intelligence.
Join Vertical

